28. 09.16 12:57 Close share menu Farmers see critical South link cable On Tuesday, TenneT has presented the possible route for the power lines in the South of Germany. Proposed is a fully underground laying of two large distribution, which should lead to Bavaria. Source http://www.topagrar.com/